Kitchen progress
Now with the walls painted we are ready to put the counter top on. The contractor finished cutting the insert for the farmhouse sink, the sink was placed, and the faucet installed. There are four layers of food safe Tung Oil on the butcher block. It looks really pretty.
The sink was a craigslist find, which had to be refinished. That happened back in January. We've been working for what seems like forever.
We decided to center the faucet between the window. The drain pan extends over to the neighboring cabinet, because IKEA doesn't make a 42" under sink cabinet. These are the little design details that confound the mind. The doors and hinges will be changed on the top cabinets and the boxes will be refinished. The kitchen should be finished around mid September. The bedroom and closet will be next, while we wait.
A well deserved first cuppa in the new place.